The bucket elevator has the advantage of large conveying capacity, high lifting height and long service time. Many of us would wondering why short circuit in winding happens in the operation, this passage introduces the methods for checking the short circuit in winding in the following:
- Check the electrical bridge;
Measure the direct-current resistance of winding. The general phase difference should not exceed 5%, if it exceeds, we can confirm that the phase with small electrical resistance has short trouble.
- Power the elevator and do experiment;
Measure the current by ammeter, short trouble exists where there is high current.
- Observe the surface of the bucket elevator;
Observe whether there is burn at the connecting box and the winding overhang.
- Check the temperature of the bucket elevator;
Operate the elevator without load for 20 minutes(power it off immediately if there is any abnormal phenomenon), and touch each part of the winding part to see if the temperature is higher than the normal temperature.
- Check by the millimeter or the Meg-ohmmeter;
Measure the insulation resistance between two any phase, if it is very low or shows no resistance, then it means there is short trouble here.
For more information, please visit http://www.pkmanufacture.com.